Petronas Carigali

PROJECT DESCRIPTION

The Anjung Field is located approximately 180 km offshore Bintulu, Sarawak with water depth of 75m in Sub-Block SK 315 with 100% PETRONAS Carigali equity. Anjung will be developed through the production of three (3) gas development wells under Kumang Cluster PSC with objective of developing a total reserve of 348 Bscf gas and 5 MMstb condensate within PSC life with planned 1st Gas Date by April 2020. One (1) spare wellhead slot will be provided as part of future well tie-in provision.

SCOPE OF WORK

Sanggul Emas job scope include the design, procurement of materials, manufacturing, supply, performance, inspection, testing, painting, delivery, shipping, handling and storage of 8” 150# FF Actuated Butterfly Valve.

 

List of projects
Customer
BROOKEDOCKYARD / PETRONAS CARIGALI SDN. BHD
Industry
Oil and Gas
Project
Anjung
Location
Bintulu Sarawak
Medium
Seawater
Brand
Boteli & Rotork

PROJECT DESCRIPTION

The Anjung Field is located approximately 180 km offshore Bintulu, Sarawak with water depth of 75m in Sub-Block SK 315 with 100% PETRONAS Carigali equity. Anjung will be developed through the production of three (3) gas development wells under Kumang Cluster PSC with objective of developing a total reserve of 348 Bscf gas and 5 MMstb condensate within PSC life with planned 1st Gas Date by April 2020. One (1) spare wellhead slot will be provided as part of future well tie-in provision.

These wells will be produced through a wellhead platform in Anjung, and the full well stream (FWS) production will be evacuated to KAKG-A Central Processing Platform (CPP) through an 18” x 8 km FWS CRA Clad (Incoloy 825) pipeline.

The expected produced gas from Anjung wells contain high CO2 concentration and small traces of mercury contamination. The quantity of CO2 and mercury expected from the wells are 12 mole% and 0.02 - 0.07µg/m³ respectively. H2S expected from the wells is 75 ppm. The facilities is designed to cater up to 300MMscf/d gas and 4500 bbl/d condensate with maximum of 150MMscf/d gas per well.

Topside facilities and intra-field pipelines for Anjung Gas Development Project shall be designed for a minimum operational life of 25 years. Structural shall be designed for aminimum operational life of 30 years. Anjung platform will be designed with SIPROD readiness.

Power generation for AJJT-A is derived from existing KAKG-A via a composite submarinecable. Composite submarine cable shall also be utilized as the main backbone communication link between AJJT-A and KAKG-A for voice, data and monitoring system

SCOPE OF WORK

Sanggul Emas job scope include the design, procurement of materials, manufacturing, supply, performance, inspection, testing, painting, delivery, shipping, handling and storage of 8” 150# FF Actuated Butterfly Valve.